Klondike wind farm near Wasco OR, USA
This is part of the future of power generation everywhere.
It's informative to note that the expected life of one of these generators is 30 years and the break-even point for the paying back the cost is 15 years.
I don't know what the break even point is for the carbon release from construction. I note that the blades that catch the wind are made in China using coal-fired power.
AMS_0575
Part of the Klondike wind farm near Wasco OR, USA
AMS_0575
Part of the Klondike wind farm near Wasco OR, USA
original size: 3000px x 1872px |
Current: 600px x 374px |
filename: AMS_0575-Edit-1 |